BANGKOK, THAILAND
BANGKOK CHONBURI NEW MOTORWAY
- 經營範圍 :
- Roads & Highways
- 專業服務 :
- Civil & Transportation Engineering
Project & Construction Management
- 服務項目 :
- Contract administration
Engineering and quality assurance
Schedule and cost control
Reporting and meetings
Construction safety and site security
Document control
Public relations
Connecting Bangkok with Chonburi
The new highway is built to connect the cities of Bangkok and Chonburi. The construction includes a 4 lanes divided highway, interchanges and overpasses. A major part of the 80 km new highway passes through low lying land with thick layers of extremely soft deposits.
Soft soil improvement
Soil improvement is required for about 60 km of the route to accelerate consolidation settlement and to reduce the residual settlement under embankments to within specified tolerances. The soil improvement method adopted for the project was the surcharge preloading technique with the installation of Prefabricated Vertical Drains (PVD). PVDs were installed to a depth of 8 m to 12 m below the existing ground with a cumulated amount of 22,665,600 m.
Scope of work
- Contract administration
- Engineering and quality assurance
- Schedule and cost control
- Reporting and meetings
- Construction safety and site security
- Document control
- Public relations
-
國道三號清水服務區
臺中, 臺灣
-
國道一號路竹科園區新增交流道第564A及第564C合併標工程
高雄, 臺灣
-
越南胡志明市阮文靈大道(平順道路)
胡志明市,越南
-
BRADDELL ROAD AND ANG MO KIO EXPRESSWAY FLYOVERS
SINGAPORE