BANGKOK, THAILAND

BANGKOK CHONBURI NEW MOTORWAY

  • 經營範圍 :
  • Roads & Highways
  • 專業服務 :
  • Civil & Transportation Engineering
    Project & Construction Management
  • 服務項目 :
  • Contract administration
    Engineering and quality assurance
    Schedule and cost control
    Reporting and meetings
    Construction safety and site security
    Document control
    Public relations

Connecting Bangkok with Chonburi

The new highway is built to connect the cities of Bangkok and Chonburi. The construction includes a 4 lanes divided highway, interchanges and overpasses. A major part of the 80 km new highway passes through low lying land with thick layers of extremely soft deposits.

 

Soft soil improvement

Soil improvement is required for about 60 km of the route to accelerate consolidation settlement and to reduce the residual settlement under embankments to within specified tolerances. The soil improvement method adopted for the project was the surcharge preloading technique with the installation of Prefabricated Vertical Drains (PVD). PVDs were installed to a depth of 8 m to 12 m below the existing ground with a cumulated amount of 22,665,600 m.

 

Scope of work

  • Contract administration
  • Engineering and quality assurance
  • Schedule and cost control
  • Reporting and meetings
  • Construction safety and site security
  • Document control
  • Public relations
相關前瞻力文章