MATSU ISLAND, TAIWAN

BEIGAN TOWNSHIP MUNICIPAL SOLID WASTE LANDFILL

  • MARKETS :
  • Solid Waste Management
  • SERVICES :
  • Environmental Engineering
  • SCOPE OF WORK :
  • Site Investigation
    Engineering Survey
    Detailed Design
    Construction Supervision

Landfill and slope terrain

This landfill is located in an approximately 2 ha large ravine in a military restricted area. Land mines and explosives were discovered and removed during construction. The construction cost was around NTD$30 million and the facility design life is estimated to be 15 years. Primary structures include a retaining wall, an access road, leachate collection and treatment system, liner system and gas collection system. A composite liner system with double-sided textured HDPE liner was used to improve slope stability.

 

Scope of work

  • Site Investigation
  • Engineering Survey
  • Detailed Design
  • Construction Supervision