TAIPEI, TAIWAN
NTU XINSHENG SOUTH ROAD UNDERGROUND PARKING LOT
- MARKETS :
- Parking
- SERVICES :
- Geotechnical Engineering
Project & Construction Management
- SCOPE OF WORK :
- Site measuring and drilling works
Design review and construction supervision
Award-winning NTU parking lot turnkey project
In July 2004, MAA was engaged for project management and supervision by the National Taiwan University for the NTU underground parking lot construction project. This turnkey project included:
- A 2 storey underground parking lot for 353 automobiles and 1330 motorcycles, with a total area of 16,290 sqm. A girder-less slab structure was adopted for space efficiency through a top-down construction method.
- A 3 storey steel structure Exhibition Hall and Shopping Center, with a 670 sqm floor area to exhibit and sell agricultural products.
- The reconstruction of the original sports field and access road.
The construction started on 23 July 2004 and was completed on 7 September 2005. Due to excellent control on schedule, quality and detailed documentation, the project was nominated as a model turnkey project. On November 5th 2005, MAA was awarded the Sixth (2005) Public Construction Golden Achievement Award for Project Management Consultation.
Scope of work
- Site measuring and drilling works
- Design review and construction supervision
RELATED PROJECTS
RELATED INSIGHTS