NEW TAIPEI CITY, TAIWAN

DANHAI LRT SYSTEM

  • MARKETS :
  • Mass Rapid Transit
  • SERVICES :
  • Transportation & Civil Engineering
  • SCOPE OF WORK :
  • Phase I - Construction supervision

Danhai New Township currently has a population of 16,000, projected by the planning agency to rise to about 300,000 inhabitants by 2041. The main goal of the project is to provide Danhai New Town and Danshui Township with a convenient means of public transportation, which will stimulate development in the area and ease traffic congestion on local roads. The total construction cost for the 13.99 km long, 20 station system is NT$15.3 billion. The first stage comprises three at-grade stations of the Blue Sea Line connecting the system to Danshui’s Fisherman’s Wharf with the distance of 2.21km and the Green Mountain Line, with 7 elevated stations, 4 at-grade stations and one depot near the G08 station. The 7.34 km track Green Mountain Line will connect Taipei MRT’s Hongshulin Station to Danhai New Township, is budgeted at NT$11.5 billion.

 

Scope of Services

Construction supervision services include:
Core system
Track system
Civil engineering (depot included)
Elevators and escalators
E&M, Environment, Plumbing
System integration and coordination
Assistance to final inspection
Others (e.g. pipelines relocation and restoration work)
 
 
Related Video Link :  https://www.youtube.com/watch?v=UOd3ykchMiI&feature=youtu.be  Blue Coast Line-Steel Arch Bridge 
                                  https://www.youtube.com/watch?v=sL1Mjv6yxao&t=2s   (Copyright by New Taipei City Government )
                                  https://www.youtube.com/watch?v=1ososfsDEJ4 (Copyright by EBC News)
                                  https://www.youtube.com/watch?v=1C4GlBtLxsQ (Copyright by TVBS News)

                                 

 
 
RELATED INSIGHTS