KAOHSIUNG, TAIWAN

TAILIN TO KAOKANG 345KV POWER CABLE

  • MARKETS :
  • Utilities
  • SERVICES :
  • Transportation & Civil Engineering
    Geotechnical Engineering
    Mechanical, Electrical & Plumbing (MEP)
  • SCOPE OF WORK :
  • Shield tunnel design
    Deep shafts design
    Cooling plant design
    E&M design and integration

New underground power cable in Kaohsiung

The construction site of this project is located in Siaogang and Daliao districts, Kaohsiung City. The tunnel alignment starts from Nankung P/S, goes along Donglin road, Beilin road, Gaoping 22nd road to Gaoping D/S and continues along Sincuo road, Sincuo Bridge, Fenglin 2nd road to Kaokang E/S through an underground shield tunnel for a 345kV/161kV power cable with a total length of 7 km.

Scope of work

  • Design of a 7,000 m long shield tunnel (inner diameter = 5.7m) for 345kV/161kV cables
  • Design of two 32 m and 42 m deep shafts
  • Design of two 27 m and 41 m deep exit shafts
  • Design of 1 cooling plant with 3 floors above ground and 2 floors underground
  • 12,400 m long E&M system design and integration