TAIPEI, TAIWAN

TAIPEI DADU ROAD COMMON UTILITY DUCT

  • MARKETS :
  • Utilities
  • SERVICES :
  • Transportation & Civil Engineering
    Geotechnical Engineering
    Environmental Engineering
  • SCOPE OF WORK :
  • Site Investigation
    Planning and design of common duct
    Design of cut and cover construction method
    Movement and protection of present structures

Increasing the number of electricity pipelines

A common duct under Dadu Road had to be developed in order to meet the demands from Taipower (Taiwan’s public electricity company) to set up more electricity lines. MAA was engaged to carry out the planning and design work for this project. The scope of services includes civil construction design, mechanical and electrical construction design, drafting of traffic safety maintenance plan and protection of existing structures.

 

Project characteristics

The duct starts at the Dadu Road and Guandu Road intersection and extends to Chengde Road before turning south to the Jhoumei Expressway. The total duct length is 3.2 kilometers and contains electricity (including a 161 KV transmission cable and a 22.8 KV distribution cable), military signal lines and future pipelines. To reduce construction costs and traffic maintenance, a cut and cover construction method was adopted.

 

Scope of work

  • Site Investigation
  • Reconfirmation of duct requirements
  • Planning and design of common duct
  • Design of cut and cover construction method
  • Movement and protection of present structures
  • Geological improvement
  • Design of transmission, vent, surveillance and emergency guide equipments
  • Traffic diversion and maintenance plan
  • Tender document preparation