SHANGHAI, CHINA

SUN-TEC MEDICAL CENTER

  • MARKETS :
  • Healthcare
  • SERVICES :
  • Structural Engineering
    Electrical, Mechanical & Plumbing (MEP)
    Architecture & Planning
  • SCOPE OF WORK :
  • Planning
    Preliminary Design
    Detailed Design

A modern medical center for Chinese and expatriates

The establishment of the Sun-Tec Medical Center in August 2005, financed by foreign investment, marked the introduction of world-class healthcare for local Chinese and expatriates in Shanghai. Total construction cost is about RMB 150 million, with a total floor area of 12,640 m2. The whole construction is now completed and in operation.

 

Scope of work

  • Planning of architecture, structure, drainage, electric wiring and air conditioning
  • Preliminary design of architecture, structure, drainage, electric wiring and air conditioning
  • Professional design during construction drawing phase
RELATED INSIGHTS