TAOYUAN, TAIWAN

TAOYUAN INTL AIRPORT PAVEMENT REHABILITATION/NAVAIDS UPGRADE

  • MARKETS :
  • Airports
  • SERVICES :
  • Transportation & Civil Engineering
    Project & Construction Management
  • SCOPE OF WORK :
  • Engineering planning
    Investigation of pavement condition
    Basic design
    Project construction management

Upgrading Taiwan’s Gateway

After 30 years in service, the Taiwan Taoyuan International Airport is in need of a major rehabilitation and upgrading to continue its role of “Taiwan’s Gateway” in the coming decades. The client commissioned the MAA-Netherlands Airport Consultants B.V. (NACO) Joint Venture to serve as General Consultant for the rehabilitation project.

 

Runway and taxiway pavements and airport navigation systems

Project objectives are to (1) rehabilitate the existing runway & taxiway pavements; (2) extend the southern runway and construct a new northern parallel taxiway; (3) upgrade airside facilities to Code 4F; (4) replace/improve navigational aids (NAVAIDs) & airfield ground light system (AGLs); (5) upgrade the airport’s instrument landing system (ILS); and (6) install an Advanced Surface Movement Guidance & Control System (A-SMGCS). Challenges of the Project are to maintain airport operations and ensure flight safety during construction and installation.

 

Scope of work

  • Engineering planning
  • Investigation of pavement condition
  • Basic design
  • Project construction management (including tender assistance, detailed design review and construction supervision)
RELATED INSIGHTS