TAIPEI, TAIWAN

KEELUNG RIVER PUMP STATION & WATER SUPPLY

  • MARKETS :
  • Water infrastructure
  • SERVICES :
  • Environmental Engineering
    Transportation & Civil Engineering
  • SCOPE OF WORK :
  • Engineering Survey
    Geotechnical Investigation
    Preliminary Design
    Detail Design
    Construction Consultancy

A 2 m wide, 2.4 km long water main tunnel in Taipei

This project involves the construction of a water main from Xinsheng Park to the Keelung River Levee in the Taipei metropolitan area. The water main is an extension line from a pressurization station in the Guandu line system and includes a 2,000 mm wide, 2400 m long section built with a tunnel boring machine (TBM) and a 1,000 mm wide, 250 m long cut-and-cover section. The TBM has an external diameter of 3,340 mm.

 

Scope of work

  • Engineering Survey
  • Geotechnical Investigation
  • Preliminary Design
  • Detail Design
  • Construction Consultancy