TAINAN, TAIWAN
ANPING RECLAIMED WATER PLANT
- MARKETS :
- Water Infrastructure
- SERVICES :
- Environmental Engineering
- SCOPE OF WORK :
- Basic Design
Detailed Design
The project includes Anping reclaimed water plant (full period capacity is 37,500CMD, first phase is 10,000CMD) and environmental education center. It is expected to begin the first phase water supply in September, 2022 and the full period water supply will begin in October, 2024. The reclaim water expected to be sent to the distribution pool via the 22.42 km pipeline. The design capacity of the distribution pool is 37,500CMD, and apply high-level treatment technology of bromide chemical dosing method to meet the contracted water quality requirement (urea<0.005mg/L).
This center can process wastewater from Yongkang sewage system and industrial wastewater from Southern Taiwan Science Park. It will also improve the domestic water system and advance the development of reclaimed water industry in Tainan. This Project will provide both practical and recreational purposes. This is the largest reclaimed water plant that supports high technology in Taiwan.
Scope of Services
- Basic Design
- Detailed Design
-
FUTIAN WASTEWATER REUSE PLANT IN TAICHUNG
TAICHUNG CITY, TAIWAN
-
RECLAIMED WATER BTO PROJECT OF NORTH DISTRICT WASTEWATER RECLAMATION CENTER IN TAOYUAN (PHASE I)
TAOYUAN CITY, TAIWAN
-
QIAOTOU RECLAIMED WATER IN KAOHSIUNG CITY
KAOHSIUNG CITY, TAIWAN
-
WASTEWATER TREATMENT PLANTS IN TAIWAN
TAIWAN