KAOHSIUNG CITY, TAIWAN

QIAOTOU RECLAIMED WATER IN KAOHSIUNG CITY

  • MARKETS :
  • Water Infrastructure
  • SERVICES :
  • Environmental and Water Engineering
  • SCOPE OF WORK :
  • Concept design
    Basic design
    Detailed design

As part of Taiwan’s effort to enhance its water supply capacity and support environmental sustainability, the Qiaotou Reclaimed Water project seeks to expand the existing sewage treatment plant to supply reclaimed water to the Nanzi Industrial Zone. The project duration includes 3-year construction and 18-year operation. The construction project includes the expansion of the sewage treatment plant (30,000CMD), while the units include a pre-treatment, preliminary sedimentation tank, biological treatment tank, Membrane Bio-Reactor Filter (MBR) and disinfection tank, improving plant efficiency and lowering costs. The reclaimed water treatment plant (30,000CMD) adopted the Reverse Osmosis (RO) process and added a boron wastewater resin tower and a membrane washing plant. The total length of the pipeline is about 12 km, with 3.2 km of the intake pipeline and 8.7 km of the water supply pipeline.
In addition, MAA provided the conceptual design of Kaohsiung New Town Sewage Treatment Plant (30,000CMD) on the reserved land. The scope of service includes the operation, maintenance, maintenance optimization, life extension, and replacement of Qiaotou sewage plant (including interception facilities), and the operation, maintenance, and replacement of the reclaimed water treatment plant (including intake and water supply pipelines).

RELATED INSIGHTS