TAICHUNG CITY, TAIWAN

FUTIAN WASTEWATER REUSE PLANT IN TAICHUNG

  • MARKETS :
  • Water Infrastructure
  • SERVICES :
  • Environmental and Water Engineering
  • SCOPE OF WORK :
  • Preliminary Design
    Detailed Design
    Construction Consultancy

In the face of climate change and its impact on water resources, the government is pushing for wastewater reuse in urban areas. The reclaimed water from this plant is mainly planned for Taichung Harbor Industrial District and aims to reduce the overall water scarcity for water consumption in both industrial and domestic sectors in Taichung. The plant is expected to provide 105,000 CMD of water after treatment.
The scope of the project covers the construction of preprocessing facilities, and water pipelines inside and outside the industrial district. The preprocessing treatment facility is planned to be located on the east side of the plant, which covers an area of 0.6 ha. The total length of the water pipeline outside is 29 km, starting from Futian Wastewater Reuse Plant, along the levee road to the south side of Zhongnan 2nd Bridge. The total length of the water pipeline inside is 280m, buried along Zhongnan 1st Road inside Taichung Harbor District.

RELATED INSIGHTS