TAOYUAN CITY, TAIWAN

LAND ACQUISITION FOR CHUNGLI SPORTS PARK IN TAOYUAN CITY

  • MARKETS :
  • Land Development
  • SERVICES :
  • Transportation and Civil Engineering
  • SCOPE OF WORK :
  • Topographic Survey
    Drilling and Piping Survey
    BIM
    Master Planning
    Basic Planning
    Detailed Planning
    Tendering Document Preparation
    Construction Supervision

In order to relieve the pressure of urban development, improve regional transportation, and enhance overall efficiency, the Mayor of Taoyuan City Wen-Tsan Cheng plans to provide to develop a sports park as well as a Metro system and lay the foundation of development for the next 20 years in Chungli.

MAA helped Taoyuan City Government design the first underground detention basin and pumping station to achieve the following four major goals:

(1) Plan urban flood detention space in Chungli.

(2) Relieve the burden on Huangwuzhuang District.

(3) Reduce the chance of flooding in the downstream area.

(4) Adopt underground use of space, and provide a multi-sports park aboveground.

The underground detention basin and pumping station cover 2 hectares, with a detention clearance depth of 5.5 meters and a detention capacity of 76,900 tons. The freeboard is about 1.2~1.4 meters (based on the slope drain), and the clearance height of the structure in the pool is 6.7~6.9 meters. The project is estimated to be completed by the end of December this year and will become the largest underground detention basin in Taiwan.