NANTOU, TAIWAN

TAICHUNG-NANTOU HIGHWAY

  • MARKETS :
  • Roads & Highways
  • SERVICES :
  • Transportation Engineering
    Environmental Engineering
  • SCOPE OF WORK :
  • Survey & Planning
    Environmental Impact Assessment
    Preliminary & Detailed Design

Relieving congestion between Taichung and Nantou

This project’s purpose is to relieve traffic congestion on Provincial highway No.3. The project, connecting the Highways No. 3 & 4 in Greater Taichung, local highway 127, provincial highway No.4 & No.4A and freeways, can improve the traffic condition between Taichung and Nantou and promote the economic and urban development in great Taichung area.

 

Project characteristics and construction methods

The project is 17.1 km in length, including surface road, interchanges, and a viaduct of 9.7 km. The road is a 2x3 lanes highway. The viaducts are built by pre-cast method, incremental launching method and free-cantilever method with prestressed and steel girders.

 

Scope of work

  • Topographic Survey
  • Soil Investigation
  • Route Alignment plan
  • Environmental Impact Assessment
  • Roads, Interchanges, viaducts preliminary and detailed design
  • Lightening and Landscape design
  • Technical advice service during construction