HSINCHU, TAIWAN

NANLIAO-CHUTONG, CHANGBIN - TAICHUNG EXPRESSWAYS

  • MARKETS :
  • Roads & Highways
  • SERVICES :
  • Transportation & Civil Engineering
  • SCOPE OF WORK :
  • Survey
    Preliminary design
    Detailed design

Improving traffic in the Greater Hsinchu region

This road is part of Taiwan’s western corridor transportation system and connects the coastal expressway with Highways no. 1 and 3 and with the Hsinchu HSR Station, enabling easy circulation in the Greater Hsinchu region.

 

Project characteristics and challenges

The total length of the project is 20 km, including surface roads, five interchanges and a four traffic lanes viaduct with a total length of 14 km. The local road is designed to be a 2x4 highway. Since the alignment lies along the south bank of Tao-Chiang River, the river dikes have to be carefully protected when the piling works are under construction.

 

Scope of work

  • Topographic Survey, Soil Investigation
  • Route alignment plan
  • Roads, interchanges, viaducts preliminary and detailed design
  • River dikes protection design during construction
  • Technical advice service during construction
RELATED INSIGHTS